# Cost per unit calculator

> Work out what each good block, paver or precast unit costs you: materials, labor, energy, waste and margin, using your own numbers.

Enter what one mix costs you and how many good units it yields. You see right away the cost of each unit, its breakdown and, if you like, your margin.

It only does the math with the numbers you enter: it does not recommend mixes, proportions, strengths or times. What you enter stays on your screen: nothing is sent or stored.

Page: https://kembrio.com/en/tools/cost-per-unit

## How it is calculated

1. Mix materials: the sum of quantity times price for each material.
2. Waste: the material cost is divided by the share you actually use. With 10% waste, divide by 0.9; the difference is what is lost.
3. Mix cost: materials, waste, labor, energy and other costs.
4. Cost per unit: the mix cost divided by the good units.
5. Margin: the selling price minus the cost per unit. The percentage is that margin divided by the selling price.

## Frequently asked questions

### What currency does it use?

Yours. Enter every value in the same currency and the result comes out in it.

### Why good units and not units produced?

Because broken units and the ones you cannot sell cost money too. Dividing by units produced gives a cost lower than the real one.

### Is my data stored?

No. The math happens in your browser: nothing is sent or stored, and it is gone when you close the page.
